+(6)03-8052 3973
Scope of Works involves 49MW LSS Farm, 33kV Collector Station, 33kV DC UGC, 132/33kV SPP Substation and 132kV Interconnection Facility Station (for TNB) with 132kV Sg Piah – Sg Siput Single Circuit Loop-in Loop Out Works
Afrima Consulting Engineer Sdn. Bhd. in Joint Venture with TOPS and DNV was appointed as the Owners’ Engineer to facilitate all design works related to the overall plant.