1. Home
  2. Proposed PMU MRT JINJANG GIS 132/33KV, Kuala Lumpur

Power Transmission Projects

Proposed PMU MRT JINJANG GIS 132/33KV, Kuala Lumpur

Afrima Consulting Engineer is the detail design consultant for the substation appointed by Tenaga Nasional Berhad (TNB)