1. Home
  2. Proposed 500/275kV Junjung Substation, Kedah

Power Transmission Projects

Proposed 500/275kV Junjung Substation, Kedah

Afrima Consulting Engineer is the detail design consultant for the substation appointed by Tenaga Nasional Berhad (TNB).